Well #2 at Six Meters. Tractor Coming.

The second well is now six meters deep using the water-blasting method, drawing water from well #1 — itself an encouraging sign of supply. The container structure is coming along. A shared tractor has been commissioned with two neighboring property owners to grade the loop road — except it broke a hose and had to send someone 60km away for a part.